There are now 13 windmills assembled,
another 12 are to be built.
This is the first one to start generating power.
Video taken on the Little Orme on 24th July 2009
and is only 4 seconds long
There are now 13 windmills assembled,
another 12 are to be built.
This is the first one to start generating power.
Video taken on the Little Orme on 24th July 2009
and is only 4 seconds long